Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Development Package
Address:
201 N STONE AV
Address NEW:
201 N STONE AV
Apply Date:
01/19/2024
Applicant:
Joshua Garcia
Description:
TEST of DP & Inspections

Permit Reviews

Permit Number - TD-DEV-0124-00015
Permit Status: Inspections
Permit Description: TEST of DP & Inspections
Start Date Submittal Complete Date Status  
05/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/09/2025 APPROVED Review Details
11/12/2024 DEVELOPMENT PACKAGE NEW v.1 11/27/2024 REQUIRES RESUBMIT Review Details
11/27/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 02/14/2025 APPROVED Review Details
01/19/2024 DEVELOPMENT PACKAGE NEW v.1 01/19/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0124-00015
Permite Description: TEST of DP & Inspections
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
02/07/2024 COT - ENGR - Stormwater N/A Not Ready
02/22/2024 SITE - SWPPP Correction Notice N/A Canceled
02/22/2024 SITE - SWPPP Violation Notice N/A Canceled
04/29/2024 SITE - Zoning Compliance N/A Not Ready
04/18/2024 PDSD Site/Engineering Division - NPPO N/A Partial Pass
03/26/2024 SITE N/A Canceled Test 3
05/14/2024 For trash and recycling enclosures N/A Not Applicable
10/08/2024 ENGR Engineering Final N/A Not Ready
COT - BASN - Drainage/Basin - Condition Inspection N/A Canceled
02/07/2024 ENGR Grading Final N/A Not Applicable
02/07/2024 SITE - Stormwater Final Inspection N/A Not Ready
04/08/2024 PDSD Engineering Division Pre-Construction SITE N/A Canceled
04/29/2024 COT - ENGR - Signage Final N/A Re-inspection required
06/03/2025 ENGR Paving N/A Not Applicable
11/03/2025 ENGR - Drainage Structures N/A Canceled
02/07/2024 COT - ENGR - Site - Assurance Release N/A Not Applicable
06/26/2025 N/A Failed
10/01/2025 N/A Partial Pass

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0124-00015
Permit Description: TEST of DP & Inspections
Total Completed Inspections - 27
Date Description Inspector Results Comments
03/27/2024 PDSD Site/Engineering Division - Landscaping Passed Landscape installed per plan
04/28/2024 COT - SITE - Zoning Intermediate Passed
04/29/2025 Passed
04/29/2025 Final inspection to ensure all landscape and water harvesting SITE Passed
04/29/2025 NPPO Monitoring Passed
04/29/2025 Passed
04/29/2025 Passed
04/29/2025 SITE - Zoning Final Passed
04/29/2025 Passed
04/29/2025 Passed
04/29/2025 For trash and recycling enclosures Passed
04/29/2025 Consultation SITE Passed
04/29/2025 ENGR Engineering Final Passed
04/29/2025 LAND Landscape Appearance & Function Final Passed
04/28/2025 NPPO Pre-Construction Passed
04/29/2025 COT - BASN - Drainage/Basin - Condition Inspection Passed
04/29/2025 ENGR Grading Final Passed
04/29/2025 SITE - Stormwater Final Inspection Passed
04/29/2025 Passed
04/29/2025 Grading Progress ENGR Passed
04/29/2025 Passed
04/29/2025 SITE - Stormwater Setup and Controls Passed
04/28/2025 PDSD Engineering Division Pre-Construction SITE Passed
04/29/2025 Passed
04/29/2025 NPPO Final Passed
04/29/2025 COT - ENGR - Signage Final Passed
09/19/2025 SITE - Stormwater Follow-up Passed

Scheduled Inspections

Scheduled Inspections - TD-DEV-0124-00015
Status: Inspections
Description: TEST of DP & Inspections
Scheduled Date Description Entered By Entered Date
10/02/2025 SITE - Recurring Site monitoring inspection Scheduled
10/02/2025 SITE - Recurring Site monitoring inspection Scheduled
09/20/2025 SITE - Stormwater Follow-up Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
CONS-2024-11-05 E-SHEETS 24057_V1.PDF DOCUMENTS VIEW