Permit: TC-UTL-0823-00084
Permit Details
Apply Date:
08/25/2023
Applicant:
Ismael Meza
Description:
Site Electrical (Dwellings on Separate Permits)
Permit Reviews
Permit Number - TC-UTL-0823-00084
Permit Status: Issued
Permit Description: Site Electrical (Dwellings on Separate Permits)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/28/2023 | PRIVATE UTILITY v.1 | 09/27/2023 | APPROVED |
Conditions
Permit Number - TC-UTL-0823-00084
Permit Status: Issued
Permit Description: Site Electrical (Dwellings on Separate Permits)
Date | Description | Comments |
---|---|---|
09/27/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-UTL-0823-00084
Permite Description: Site Electrical (Dwellings on Separate Permits)
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/05/2024 | COT - LCEL - Electrical Underground | N/A | Partial Pass | Partial pass. All under ground electric depth per plan and conduit went up a size. Total of 20 pads. Okay to backfill. 1 foot of backfill then communication conduit will be placed on top of fill. Pending 50 feet from entrance to junction box then to primary transformer. 1/5/2024 |
10/20/2023 | COT - LCEL - Electrical Progress | N/A | Not Ready | 10/20/23: not ready needed information on trench |