Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Utilities Permit
Address NEW:
6207 E BELLEVUE ST
Apply Date:
08/09/2023
Applicant:
Description:
Site/Grading - Rook Bellevue Homes. Multi-family with single family units. 20 homes... sewer, water, tep, com

Permit Reviews

Permit Number - TC-UTL-0823-00080
Permit Status: Issued
Permit Description: Site/Grading - Rook Bellevue Homes. Multi-family with single family units. 20 homes... sewer, water, tep, com
Start Date Submittal Complete Date Status  
08/11/2023 PRIVATE UTILITY v.2 09/13/2023 APPROVED Review Details
08/09/2023 PRIVATE UTILITY v.1 08/09/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-UTL-0823-00080
Permite Description: Site/Grading - Rook Bellevue Homes. Multi-family with single family units. 20 homes... sewer, water, tep, com
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/26/2023 COT - LCPL - Sewer N/A Partial Pass 10/26/23: 20 sewer lines from the property line to rough stub in approved to shade and cover.
03/27/2024 COT - LCEL - Electrical Underground N/A Not Applicable By TEP.
03/28/2024 COT - HCEL - Electrical Final N/A Not Applicable
03/28/2024 COT - LCEL - Electrical Final N/A Not Applicable
03/28/2024 COT - LCEL - Electrical Progress N/A Not Applicable
04/04/2024 SITE - Zoning Final N/A Not Ready Underground utility work is happening at this time not ready for any type of inspections.

Completed Inspections

Permit Status: Issued
Permit Number: TC-UTL-0823-00080
Permit Description: Site/Grading - Rook Bellevue Homes. Multi-family with single family units. 20 homes... sewer, water, tep, com
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/27/2023 COT - LCPL - Sewer Passed
12/27/2023 COT - LCPL - Yard Water Line Passed 12/27/23: Contractor has installed new main water lines and meter line taps. All work has been inspected by City of Tucson Water Department Construction Inspector Jeff Hancock. He will be performing the pressure testing and chlorination testing on the entire water supply system.
03/28/2024 COT - LCPL - Plumbing Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
ROOK-BELLEVUE UTILITY PLAN_V1.PDF DOCUMENTS VIEW