Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Utilities Permit
Address NEW:
818 W MIRACLE MILE
Apply Date:
06/15/2023
Applicant:
Brad Farkas
Description:
Installation of new 80' monopole, 30'x30'x8' chain link fence, new telco and electrical service

Permit Reviews

Permit Number - TC-UTL-0623-00071
Permit Status: Issued
Permit Description: Installation of new 80' monopole, 30'x30'x8' chain link fence, new telco and electrical service
Start Date Submittal Complete Date Status  
06/22/2023 UTILITIES REVIEW v.1 07/17/2023 APPROVED Review Details
10/03/2023 UTILITIES REVIEW v.1 11/15/2023 APPROVED Review Details
07/17/2023 RESTAMP - COMMERCIAL v.1 07/20/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-UTL-0623-00071
Permit Status: Issued
Permit Description: Installation of new 80' monopole, 30'x30'x8' chain link fence, new telco and electrical service
Total Outstanding Activity Conditions - 5
Date Name
07/17/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
07/17/2023 The generator shall include a fuel catchment feature designed to contain at least 210 gallons of fuel in the event of a leak.
07/17/2023 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
07/17/2023 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
07/17/2023 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-UTL-0623-00071
Permite Description: Installation of new 80' monopole, 30'x30'x8' chain link fence, new telco and electrical service
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/14/2023 COT - LCEL - Electrical Underground N/A Partial Pass Partial for the primary conduits from the transformer location to the power pole, okay to backfill progress areas
10/03/2023 COT - LCEL - Grounding/Bonding N/A Partial Pass Ground bars with Cad-welded connections for ground ring at service panels and tower locations, verbal approval to backfill progress areas was given by TG
Partial approval pending plan revision to show ground bars in lieu of ground rods (hard grade)
12/06/2023 COT - LCBU - Building Final N/A Not Applicable duplicate

Completed Inspections

Permit Status: Issued
Permit Number: TC-UTL-0623-00071
Permit Description: Installation of new 80' monopole, 30'x30'x8' chain link fence, new telco and electrical service
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/03/2023 COT - LCEL - Electrical Underground Passed Approved underground conduit from service panels to distribution panels, okay to backfill progress areas
10/06/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
12/06/2023 COT - LCEL - Electrical Final Passed
12/06/2023 BULD - Electrical Clearance Passed Approved new service cabinet, ECO Clearance required for meter labeled CS1

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_BP REVISION LETTER_AZ02-151 BOONDOCKS_V1.PDF DOCUMENTS VIEW
CONS-1_BP REVISION SITE PLANS_AZ02-151 BOONDOCKS_REV. 2_100 CD'S_09.27.2023_S-S_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_GEOADDENDUM_V1.PDF DOCUMENTS VIEW
1_GEOREPORT_V1.PDF DOCUMENTS VIEW
1_TOWER-FOUNDATION DESIGN CALCS_V1.PDF DOCUMENTS VIEW
1_TUCSON IT CELL TOWER APP_V1.PDF DOCUMENTS VIEW
CONS-1_SITE PLANS_V1.PDF DOCUMENTS VIEW