Permit Details

Status:
Complete
Type:
Utilities Permit
Address NEW:
7001 E BROADWAY BL
Apply Date:
04/12/2023
Applicant:
Adam Sheridan
Description:
Construction Authorization for Pima County submitted, looking for private utilities permit to allow for sewer work.

Permit Reviews

Permit Number - TC-UTL-0423-00059
Permit Status: Complete
Permit Description: Construction Authorization for Pima County submitted, looking for private utilities permit to allow for sewer work.
Start Date Submittal Complete Date Status  
04/28/2023 PRIVATE UTILITY v.1 05/01/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-UTL-0423-00059
Permite Description: Construction Authorization for Pima County submitted, looking for private utilities permit to allow for sewer work.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/15/2023 BULD - Electrical Clearance N/A Not Applicable clearance has been issued

Completed Inspections

Permit Status: Complete
Permit Number: TC-UTL-0423-00059
Permit Description: Construction Authorization for Pima County submitted, looking for private utilities permit to allow for sewer work.
Total Completed Inspections - 11
Date Description Inspector Results Comments
08/09/2023 COT - LCEL - Electrical Progress Passed
08/10/2023 COT - HCPL - Gas Final Passed
08/10/2023 COT - LCEL - Electrical Underground Passed
09/01/2023 PDSD Sewer Pre-Construction Meeting Passed
08/10/2023 COT - LCPL - Gas Final Passed
08/10/2023 COT - LCPL - Sewer Passed
08/10/2023 COT - HCPL - Plumbing Final Passed
08/10/2023 COT - LCPL - Plumbing Final Passed
08/15/2023 SITE - Zoning Final Passed
08/28/2023 COT - LCEL - Electrical Final Passed 8/15/23: Change the electric final to building final, provide a letter of completion from the sewer/manhole
Registered designer and submit a copy to the City of Tucson thru the portal.

8/28/23: letter of compliance issued by the Engineer of Record and downloaded in the portal. All vacuum tests were passed.
08/28/2023 COT - HCEL - Electrical Final Passed 8/15/23: Change the electric final to building final, provide a letter of completion from the sewer/manhole
Registered designer and submit a copy to the City of Tucson thru the portal.

8/28/23: letter of compliance issued by the Engineer of Record and downloaded in the portal. All vacuum tests were passed.