Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-UTL-0423-00059
Permit Details
Apply Date:
04/12/2023
Applicant:
Glenn Underwood
Description:
Construction Authorization for Pima County submitted, looking for private utilities permit to allow for sewer work.
Permit Reviews
Permit Number - TC-UTL-0423-00059
Permit Status: Complete
Permit Description: Construction Authorization for Pima County submitted, looking for private utilities permit to allow for sewer work.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/28/2023 | PRIVATE UTILITY v.1 | 05/01/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-UTL-0423-00059
Permite Description: Construction Authorization for Pima County submitted, looking for private utilities permit to allow for sewer work.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/15/2023 | BULD - Electrical Clearance | N/A | Not Applicable | clearance has been issued |
Completed Inspections
Permit Status: Complete
Permit Number: TC-UTL-0423-00059
Permit Description: Construction Authorization for Pima County submitted, looking for private utilities permit to allow for sewer work.
Total Completed Inspections - 11
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2023 | COT - LCEL - Electrical Progress | Passed | ||
08/10/2023 | COT - HCPL - Gas Final | Passed | ||
08/10/2023 | COT - LCEL - Electrical Underground | Passed | ||
09/01/2023 | PDSD Sewer Pre-Construction Meeting | Passed | ||
08/10/2023 | COT - LCPL - Gas Final | Passed | ||
08/10/2023 | COT - LCPL - Sewer | Passed | ||
08/10/2023 | COT - HCPL - Plumbing Final | Passed | ||
08/10/2023 | COT - LCPL - Plumbing Final | Passed | ||
08/15/2023 | SITE - Zoning Final | Passed | ||
08/28/2023 | COT - LCEL - Electrical Final | Passed | 8/15/23: Change the electric final to building final, provide a letter of completion from the sewer/manhole Registered designer and submit a copy to the City of Tucson thru the portal. 8/28/23: letter of compliance issued by the Engineer of Record and downloaded in the portal. All vacuum tests were passed. |
|
08/28/2023 | COT - HCEL - Electrical Final | Passed | 8/15/23: Change the electric final to building final, provide a letter of completion from the sewer/manhole Registered designer and submit a copy to the City of Tucson thru the portal. 8/28/23: letter of compliance issued by the Engineer of Record and downloaded in the portal. All vacuum tests were passed. |