Permit: TC-UTL-0325-00018
Permit Details
Apply Date:
03/19/2025
Applicant:
Alex Pillion
Description:
84-Unit Multifamily Development
Permit Reviews
Permit Number - TC-UTL-0325-00018
Permit Status: Inspections
Permit Description: 84-Unit Multifamily Development
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/18/2025 | PRIVATE UTILITY REVISION v.1 | 07/22/2025 | APPROVED |
| 05/06/2025 | PRIVATE UTILITY v.2 | 05/12/2025 | APPROVED |
| 03/20/2025 | PRIVATE UTILITY v.1 | 04/21/2025 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-UTL-0325-00018
Permite Description: 84-Unit Multifamily Development
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2026 | COT - HCPL - Plumbing Final | N/A | Partial Pass | 7-27-26: verified MEP's ( diffuser/light) at 2nd floor corridor by elevator. Finals at South-wing Rooftop- missing permanent labeling at disconnects. Disconnect labels shall identify purpose and circuit, complete UV taping of HVAC line sets, weather resistant GFCI' s required at equipment receptacles and paint all PVC |
| 08/05/2026 | COT - LCEL - Electrical Underground | N/A | Canceled | Canceled per contractor. 8/5/2026 |