Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Utilities Permit
Apply Date:
02/15/2023
Applicant:
Brad Farkas
Description:
Installation of a wireless telecommunication monoelm tower and compound surrounded with CMU block wall, also installation of electrical and telco service

Permit Reviews

Permit Number - TC-UTL-0223-00045
Permit Status: Issued
Permit Description: Installation of a wireless telecommunication monoelm tower and compound surrounded with CMU block wall, also installation of electrical and telco service
Start Date Submittal Complete Date Status  
03/13/2023 UTILITIES REVIEW v.2 04/07/2023 REQUIRES RESUBMIT Review Details
04/27/2023 RESTAMP - COMMERCIAL v.1 04/28/2023 APPROVED Review Details
04/27/2023 UTILITIES REVIEW v.3 04/27/2023 APPROVED Review Details
02/28/2023 UTILITIES REVIEW v.1 03/01/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-UTL-0223-00045
Permit Status: Issued
Permit Description: Installation of a wireless telecommunication monoelm tower and compound surrounded with CMU block wall, also installation of electrical and telco service
Date Description Comments
04/28/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-UTL-0223-00045
Permite Description: Installation of a wireless telecommunication monoelm tower and compound surrounded with CMU block wall, also installation of electrical and telco service
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/02/2023 COT - LCEL - Electrical Underground N/A Not Applicable No electrical work talked to on site contractor
06/27/2023 COT - LCBU - Building Final N/A Partial Pass Partial 2nd lift final lift okay for grout. 6/27/2023

Completed Inspections

Permit Status: Issued
Permit Number: TC-UTL-0223-00045
Permit Description: Installation of a wireless telecommunication monoelm tower and compound surrounded with CMU block wall, also installation of electrical and telco service
Total Completed Inspections - 6
Date Description Inspector Results Comments
05/25/2023 COT - LCEL - Electrical Progress Passed Approved for underground electric from service panel location to the equipment cabinet location and to generator location, okay to backfill progress areas
06/08/2023 COT - LCEL - Grounding/Bonding Passed 6-8-2023. Grounding for new electric service approved.
06/08/2023 BULD - Electrical Clearance Passed Clear eco for new cell electric service.
06/13/2023 COT - LCBU - Excavation/Rebar/Zoning Passed Approved foundation for 8' high 30'x30' perimeter wall, okay for concrete placement
12/22/2023 COT - LCBU - Building Final Passed
12/22/2023 COT - LCEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-AZ02-154 MCTWIST_REV. 0_100 CD'S_01.10.23_S-S (3)_V1.PDF DOCUMENTS VIEW
AZ02-154_MCTWIST_CMU_WALL_11-04-22_S-S_V1.PDF DOCUMENTS VIEW
AZ02-154 MCTWIST CALCS SS (22-082) (2022-11-10)_V1.PDF DOCUMENTS VIEW
PROJECT AZ02-154 MCTWIST_IT_CELL_TOWER_APP_03.07.2023_V1.PDF DOCUMENTS VIEW
AZ02-154 MCTWIST DWGS SS (22-082) (2022-11-10)_V1.PDF DOCUMENTS VIEW
63225106 AZ02-154 MCTWIST.GEOREPORT_V1.PDF DOCUMENTS VIEW
CONS-PROJECT AZ02-154 MCTWIST_IT_CELL_TOWER_APP_03.06.2023_V2.PDF DOCUMENTS VIEW