Permit: TC-SOL-1224-00914
Permit Details
Status:
Complete
Type:
Solar
Address:
839 E MINORKA RD BLDG 1 UNIT 1107
Address NEW:
839 E MINORKA RD BLDG 1 UNIT 1107
Apply Date:
12/30/2024
Applicant:
Hailey McGaw
Description:
REV 1: 09/05/2025 ROOF MOUNTED PHOTOVOLTAIC SYSTEM - 8.00 KW (DC), 6.00 KW (AC) (20) NEW ZNSHINE; ZXM7-SH108_400/M - 400W MODULES (20) NEW OPTIMZERS; SOLAREDGE; P SERIES 505 (1) NEW INVERTER; SOLAREDGE; SE6000H-US HD WAVE [SI1] (1) NEW UTILITY DG DISCONNECT (1) NEW DG METER (1) NEW 35AMP PHOTOVOLTAIC BREAKER (48) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED GROUND BONDING
Permit Reviews
Permit Number - TC-SOL-1224-00914
Permit Status: Complete
Permit Description: REV 1: 09/05/2025
ROOF MOUNTED PHOTOVOLTAIC SYSTEM - 8.00 KW (DC), 6.00 KW (AC)
(20) NEW ZNSHINE; ZXM7-SH108_400/M - 400W MODULES
(20) NEW OPTIMZERS; SOLAREDGE; P SERIES 505
(1) NEW INVERTER; SOLAREDGE; SE6000H-US HD WAVE [SI1]
(1) NEW UTILITY DG DISCONNECT
(1) NEW DG METER
(1) NEW 35AMP PHOTOVOLTAIC BREAKER
(48) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH
INTEGRATED GROUND BONDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/31/2024 | RESIDENTIAL SOLAR APP v.1 | 12/31/2024 | APPROVED |
| 09/02/2025 | RESIDENTIAL SOLAR REVISION v.1 | 09/02/2025 | REQUIRES RESUBMIT |
| 09/05/2025 | RESIDENTIAL SOLAR REVISION v.2 | 09/05/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-1224-00914
Permit Description: REV 1: 09/05/2025
ROOF MOUNTED PHOTOVOLTAIC SYSTEM - 8.00 KW (DC), 6.00 KW (AC)
(20) NEW ZNSHINE; ZXM7-SH108_400/M - 400W MODULES
(20) NEW OPTIMZERS; SOLAREDGE; P SERIES 505
(1) NEW INVERTER; SOLAREDGE; SE6000H-US HD WAVE [SI1]
(1) NEW UTILITY DG DISCONNECT
(1) NEW DG METER
(1) NEW 35AMP PHOTOVOLTAIC BREAKER
(48) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH
INTEGRATED GROUND BONDING
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 09/24/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar mater |