Permit: TC-SOL-1224-00816
Permit Details
Apply Date:
12/10/2024
Applicant:
TFS Solar
Description:
Roof mount 7.31kW DC photovoltaic solar system; 17 modules with microinverters, 2 branches, PV Combiner Box, 40A PV breaker on 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-SOL-1224-00816
Permit Status: Inspections complete
Permit Description: Roof mount 7.31kW DC photovoltaic solar system; 17 modules with
microinverters, 2 branches, PV
Combiner Box, 40A PV breaker on
200A bus with 200A MCB
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/11/2024 | RESIDENTIAL SOLAR APP v.1 | 12/11/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-SOL-1224-00816
Permit Status: Inspections complete
Permit Description: Roof mount 7.31kW DC photovoltaic solar system; 17 modules with
microinverters, 2 branches, PV
Combiner Box, 40A PV breaker on
200A bus with 200A MCB
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-SOL-1224-00816
Permit Status: Inspections complete
Permit Description: Roof mount 7.31kW DC photovoltaic solar system; 17 modules with
microinverters, 2 branches, PV
Combiner Box, 40A PV breaker on
200A bus with 200A MCB
Date | Description | Comments |
---|---|---|
07/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-SOL-1224-00816
Permit Description: Roof mount 7.31kW DC photovoltaic solar system; 17 modules with
microinverters, 2 branches, PV
Combiner Box, 40A PV breaker on
200A bus with 200A MCB
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/28/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
01/28/2025 | COT - RSOL - Electrical Final Solar Project | Passed |