Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Solar
Address:
225 N SEDGE LN
Address NEW:
225 N SEDGE LN
Apply Date:
11/17/2025
Applicant:
Juana Quiroz
Description:
REV. 1: 12/16/2025 Rooftop Mounted Solar Energy System PV+ST 13 Q.TRON BLK M-G2+ 430 solar modules 1 SE3800H-US {240V} inverter 1 BAT-10K1P battery System Size: 5.59 kW DC (3.75 kW AC)

Permit Reviews

Permit Number - TC-SOL-1125-01514
Permit Status: Inspections
Permit Description: REV. 1: 12/16/2025 Rooftop Mounted Solar Energy System PV+ST 13 Q.TRON BLK M-G2+ 430 solar modules 1 SE3800H-US {240V} inverter 1 BAT-10K1P battery System Size: 5.59 kW DC (3.75 kW AC)
Start Date Submittal Complete Date Status  
11/20/2025 RESIDENTIAL SOLAR APP v.2 11/20/2025 APPROVED Review Details
11/18/2025 RESIDENTIAL SOLAR APP v.1 11/20/2025 REQUIRES RESUBMIT Review Details
12/16/2025 RESIDENTIAL SOLAR REVISION v.1 12/16/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-1125-01514
Permite Description: REV. 1: 12/16/2025 Rooftop Mounted Solar Energy System PV+ST 13 Q.TRON BLK M-G2+ 430 solar modules 1 SE3800H-US {240V} inverter 1 BAT-10K1P battery System Size: 5.59 kW DC (3.75 kW AC)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/05/2026 COT - RSOL - Electrical Final Solar Project N/A Re-inspection required Reinspection required. Solar inspections with the city are done virtually, tech needed on site for inspection or full install pictures required to be uploaded.
02/05/2026 BULD - Electrical Clearance N/A Re-inspection required Reinspection required. Solar inspections with the city are done virtually, tech needed on site for inspection or full install pictures required to be uploaded.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-1125-01514
Permit Description: REV. 1: 12/16/2025 Rooftop Mounted Solar Energy System PV+ST 13 Q.TRON BLK M-G2+ 430 solar modules 1 SE3800H-US {240V} inverter 1 BAT-10K1P battery System Size: 5.59 kW DC (3.75 kW AC)
Total Completed Inspections - 2
Date Description Inspector Results Comments
02/12/2026 COT - RSOL - Electrical Final Solar Project Passed
02/12/2026 BULD - Electrical Clearance Passed Clearance for TEP DGC/BAT. 2/12/2026

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20251117-9-1534-4495-B_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-IND-5200GUY SMITHPLANSV112-12-2025_V1.PDF DOCUMENTS VIEW
REV LETTER_V1.PDF DOCUMENTS VIEW
APPROVAL-UPLOADS-SA20251117-9-1534-4495-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-IND-5200 GUY SMITH PLANS V1_V1.PDF DOCUMENTS VIEW
SOLARAPP DOC_V1.PDF DOCUMENTS VIEW