Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Solar
Address NEW:
402 E MCMILLAN DR
Apply Date:
11/22/2024
Applicant:
Hailey McGraw
Description:
other permit was withdrawn - Freedom forever applied for 2 permits for the same address. Please resubmit under the permit number you'll be moving forward with and submit a withdrawal for the duplicate #TC-SOL-1124-00771. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf " Install 6.15kw residential roof mounted solar

Permit Reviews

Permit Number - TC-SOL-1124-00772
Permit Status: Complete
Permit Description: other permit was withdrawn - Freedom forever applied for 2 permits for the same address. Please resubmit under the permit number you'll be moving forward with and submit a withdrawal for the duplicate #TC-SOL-1124-00771. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf " Install 6.15kw residential roof mounted solar
Start Date Submittal Complete Date Status  
11/26/2024 RESIDENTIAL SOLAR APP v.1 11/26/2024 REQUIRES RESUBMIT Review Details
06/05/2025 RESIDENTIAL SOLAR APP v.2 06/05/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-SOL-1124-00772
Permit Description: other permit was withdrawn - Freedom forever applied for 2 permits for the same address. Please resubmit under the permit number you'll be moving forward with and submit a withdrawal for the duplicate #TC-SOL-1124-00771. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf " Install 6.15kw residential roof mounted solar
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/24/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter
06/24/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
CHECKLIST_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANS_V1.PDF DOCUMENTS VIEW
RESPONSE_V1.PDF DOCUMENTS VIEW
SPECS_V1.PDF DOCUMENTS VIEW