Permit: TC-SOL-1124-00737
Permit Details
Apply Date:
11/12/2024
Applicant:
Manuel corona
Description:
Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. rooftop solar
Permit Reviews
Permit Number - TC-SOL-1124-00737
Permit Status: Complete
Permit Description: Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP.
rooftop solar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/13/2024 | RESIDENTIAL SOLAR v.1 | 11/20/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-1124-00737
Permite Description: Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP.
rooftop solar
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2024 | BULD - Electrical Clearance | N/A | Canceled | Canceled per contractor. 12/19/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-1124-00737
Permit Description: Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP.
rooftop solar
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2024 | BULD - Electrical Clearance | Passed | 12/30/24 TEP CLEARANCE: DGC |
|
| 12/30/2024 | COT - RSOL - Electrical Final Solar Project | Passed |