Permit: TC-SOL-1124-00733
Permit Details
Apply Date:
11/11/2024
Applicant:
TFS Solar
Description:
Roof mount 8.60kW DC photovoltaic solar system; 20 modules with microinverters, 3 branches, PV Combiner Box, interconnection via 60A meter socket adapter to 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-SOL-1124-00733
Permit Status: Complete
Permit Description: Roof mount 8.60kW DC photovoltaic solar system; 20 modules with microinverters, 3 branches, PV Combiner Box, interconnection via 60A meter socket adapter to 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/13/2024 | RESIDENTIAL SOLAR APP v.1 | 11/13/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-1124-00733
Permite Description: Roof mount 8.60kW DC photovoltaic solar system; 20 modules with microinverters, 3 branches, PV Combiner Box, interconnection via 60A meter socket adapter to 200A bus with 200A MCB
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 60A meter adapter - DGL Clearance was called into TEP Pending solar |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-1124-00733
Permit Description: Roof mount 8.60kW DC photovoltaic solar system; 20 modules with microinverters, 3 branches, PV Combiner Box, interconnection via 60A meter socket adapter to 200A bus with 200A MCB
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
| 01/15/2025 | COT - RSOL - Electrical Final Solar Project | Passed |