Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Solar
Address NEW:
4027 E WHITMAN ST
Apply Date:
10/17/2025
Applicant:
TFS Solar
Description:
Roof mount 6.96 kW DC photovoltaic solar system; 16 modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 1 battery expansion pack, (no inverter). 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.

Permit Reviews

Permit Number - TC-SOL-1025-01406
Permit Status: Inspections
Permit Description: Roof mount 6.96 kW DC photovoltaic solar system; 16 modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 1 battery expansion pack, (no inverter). 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Start Date Submittal Complete Date Status  
10/17/2025 RESIDENTIAL SOLAR APP v.1 10/17/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-1025-01406
Permite Description: Roof mount 6.96 kW DC photovoltaic solar system; 16 modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 1 battery expansion pack, (no inverter). 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/22/2025 BULD - Electrical Clearance N/A Partial Pass 12.22.25
Approved for DGL Tesla backup switch

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-1025-01406
Permit Description: Roof mount 6.96 kW DC photovoltaic solar system; 16 modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 1 battery expansion pack, (no inverter). 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 2
Date Description Inspector Results Comments
01/26/2026 BULD - Electrical Clearance Passed 01/26/2026
Clearance TEP DGC/BAT.
01/26/2026 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-GRECCHI GIULIO PV 6.96 KW STORAGE 27 KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW
GRECCHI GIULIO PV SAPP APPROVAL-DOCUMENT-SA20251016-9-1420-30-A_V1.PDF DOCUMENTS VIEW
GRECCHI GIULIO PV SPECS APPROVAL-UPLOADS-SA20251016-9-1420-30-A_V1.PDF DOCUMENTS VIEW