Permit Details

Status:
Inspections
Type:
Solar
Address:
2425 N TREAT AV
Address NEW:
2425 N TREAT AV
Apply Date:
09/02/2025
Applicant:
Hailey McGaw
Description:
THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (27) NEW PHOTOVOLTAIC MODULES · (27) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW MAIN SERVICE UPGRADE · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (46) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING

Permit Reviews

Permit Number - TC-SOL-0925-01190
Permit Status: Inspections
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (27) NEW PHOTOVOLTAIC MODULES · (27) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW MAIN SERVICE UPGRADE · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (46) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Start Date Submittal Complete Date Status  
09/02/2025 RESIDENTIAL SOLAR APP v.1 09/02/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0925-01190
Permite Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (27) NEW PHOTOVOLTAIC MODULES · (27) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW MAIN SERVICE UPGRADE · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (46) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/29/2025 BULD - Electrical Clearance N/A Canceled Canceled per contractor. 10/29/2025
10/29/2025 COT - RSOL - Electrical Final Solar Project N/A Canceled Canceled per contractor. 10/29/2025

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0925-01190
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (27) NEW PHOTOVOLTAIC MODULES · (27) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW MAIN SERVICE UPGRADE · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (46) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/31/2025 BULD - Electrical Clearance Passed Clearance for TEP DGC. 10/31/2025
10/31/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20250902-9-1204-3924-A_V1.PDF DOCUMENTS VIEW
APPROVAL-UPLOADS-SA20250902-9-1204-3924-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-AZ-R25103_GARCIA, DANIEL_PLANS_V1.PDF DOCUMENTS VIEW