Permit: TC-SOL-0924-00578
Permit Details
Apply Date:
09/25/2024
Applicant:
RAYMOND VALENCIA
Description:
REV A: (N) 125A sub panel on plans, UTILITY AC DISCONNECT updated to UTILITY, FUSED AC DISCONNECT (location updated) Installation of 15.58 kW Roof mount PV System - 41 Microinverters/Modules, (N) 225A Bus, (N) 200A Main breaker
Permit Reviews
Permit Number - TC-SOL-0924-00578
Permit Status: Complete
Permit Description: REV A: (N) 125A sub panel on plans, UTILITY AC DISCONNECT updated to UTILITY, FUSED AC DISCONNECT (location updated)
Installation of 15.58 kW Roof mount PV System - 41 Microinverters/Modules, (N) 225A Bus, (N) 200A Main breaker
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/13/2025 | RESIDENTIAL SOLAR REVISION v.2 | 06/13/2025 | APPROVED |
| 06/13/2025 | RESIDENTIAL SOLAR REVISION v.1 | 06/13/2025 | REQUIRES RESUBMIT |
| 09/26/2024 | RESIDENTIAL SOLAR APP v.1 | 09/27/2024 | REQUIRES RESUBMIT |
| 12/05/2024 | RESIDENTIAL SOLAR APP v.3 | 12/05/2024 | APPROVED |
| 12/03/2024 | RESIDENTIAL SOLAR APP v.2 | 12/03/2024 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0924-00578
Permit Description: REV A: (N) 125A sub panel on plans, UTILITY AC DISCONNECT updated to UTILITY, FUSED AC DISCONNECT (location updated)
Installation of 15.58 kW Roof mount PV System - 41 Microinverters/Modules, (N) 225A Bus, (N) 200A Main breaker
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 07/21/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |