Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Solar
Address:
6018 S EUCLID AV
Address NEW:
6018 S EUCLID AV
Apply Date:
08/31/2026
Applicant:
Project Manager
Description:
Installation of roof-mounted PV SYSTEM SIZE: DC SIZE : 18 X 405W=7.290 KW DC AC SIZE : 1 X 11500W=11.500 KW AC (18) LONGI LR5-54HPB-405M (405W) [BLK] MODULES (1) TESLA POWERWALL 3 (MODEL NO- 1707000-60-M) (1) TESLA BACKUP SWITCH (MODEL NO -1624171-XX-Y)

Permit Reviews

Permit Number - TC-SOL-0826-00515
Permit Status: Inspections
Permit Description: Installation of roof-mounted PV SYSTEM SIZE: DC SIZE : 18 X 405W=7.290 KW DC AC SIZE : 1 X 11500W=11.500 KW AC (18) LONGI LR5-54HPB-405M (405W) [BLK] MODULES (1) TESLA POWERWALL 3 (MODEL NO- 1707000-60-M) (1) TESLA BACKUP SWITCH (MODEL NO -1624171-XX-Y)
Start Date Submittal Complete Date Status  
09/01/2026 RESIDENTIAL SOLAR APP v.1 N/A APPROVED Review Details

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0826-00515
Permit Description: Installation of roof-mounted PV SYSTEM SIZE: DC SIZE : 18 X 405W=7.290 KW DC AC SIZE : 1 X 11500W=11.500 KW AC (18) LONGI LR5-54HPB-405M (405W) [BLK] MODULES (1) TESLA POWERWALL 3 (MODEL NO- 1707000-60-M) (1) TESLA BACKUP SWITCH (MODEL NO -1624171-XX-Y)
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/01/2026 BULD - Electrical Clearance Passed Verbal clearance to TEP DGL. (Tesla backup switch)
Final inspection completed same day. Clearances to TEP DGC/DGL/BAT. 10/1/2026
10/01/2026 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20260831-9-500-4592-A_V1.PDF DOCUMENTS VIEW
APPROVAL-UPLOADS-SA20260831-9-500-4592-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-PLANS-DELLA ROMERO (6018)-6018-EUCLID-AV_V1.PDF DOCUMENTS VIEW