Permit: TC-SOL-0826-00497
Permit Details
Apply Date:
08/24/2026
Applicant:
Inty Ops
Description:
REV. 1 (9/16/2026) INSTALLATION OF A 11.50 KW (AC) PV SYSTEM + BATTERY INTEGRATED
Permit Reviews
Permit Number - TC-SOL-0826-00497
Permit Status: Inspections
Permit Description: REV. 1 (9/16/2026)
INSTALLATION OF A 11.50 KW (AC) PV SYSTEM + BATTERY INTEGRATED
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/16/2026 | RESIDENTIAL SOLAR REVISION v.1 | 09/16/2026 | REQUIRES RESUBMIT |
| 08/25/2026 | RESIDENTIAL SOLAR APP v.1 | N/A | APPROVED |
| 09/16/2026 | RESIDENTIAL SOLAR REVISION v.2 | N/A | APPROVED |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0826-00497
Permit Description: REV. 1 (9/16/2026)
INSTALLATION OF A 11.50 KW (AC) PV SYSTEM + BATTERY INTEGRATED
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2026 | BULD - Electrical Clearance | Passed | 10-12-26 DGL/BAT Clearance approved | |
| 10/12/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 10-12-26 electrical final approved |