Permit Details

Status:
Complete
Type:
Solar
Apply Date:
08/28/2025
Applicant:
Austin Matson
Description:
THIS PROJECT IS COMPRISED OF THE FOLLOWING: <br /> · NEW PHOTOVOLTAIC 450W MODULES<br /> · NEW DC/AC 7.6KW INVERTER<br /> · NEW OPTIMIZERS S440<br /> · NEW UTILITY DG METER SOCKET<br /> · NEW UTILITY DG DISCONNECT SWITCH<br /> · NEW PHOTOVOLTAIC BACK-FEED BREAKER<br /> · NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING

Permit Reviews

Permit Number - TC-SOL-0825-01163
Permit Status: Complete
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING: <br /> · NEW PHOTOVOLTAIC 450W MODULES<br /> · NEW DC/AC 7.6KW INVERTER<br /> · NEW OPTIMIZERS S440<br /> · NEW UTILITY DG METER SOCKET<br /> · NEW UTILITY DG DISCONNECT SWITCH<br /> · NEW PHOTOVOLTAIC BACK-FEED BREAKER<br /> · NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Start Date Submittal Complete Date Status  
08/29/2025 RESIDENTIAL SOLAR APP v.1 08/29/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-SOL-0825-01163
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING: <br /> · NEW PHOTOVOLTAIC 450W MODULES<br /> · NEW DC/AC 7.6KW INVERTER<br /> · NEW OPTIMIZERS S440<br /> · NEW UTILITY DG METER SOCKET<br /> · NEW UTILITY DG DISCONNECT SWITCH<br /> · NEW PHOTOVOLTAIC BACK-FEED BREAKER<br /> · NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/24/2025 COT - RSOL - Electrical Final Solar Project Passed
09/24/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar mater

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20250821-9-1150-3924-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-RIO AZUL PARTNERS LLC_UNIT 1112_CITY OF TUCSON_PLANS_VERSION 3_V1.PDF DOCUMENTS VIEW
SE-HD-WAVE-SINGLE-PHASE-INVERTER-DATASHEET-NA_V1.PDF DOCUMENTS VIEW