Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Solar
Apply Date:
08/26/2025
Applicant:
Hailey McGraw
Description:
installation of 11.89kw residential roof mounted solar / 1 SolarEdge Energy Bank / New 225A main panel upgrade / New 125A load center

Permit Reviews

Permit Number - TC-SOL-0825-01144
Permit Status: Inspections
Permit Description: installation of 11.89kw residential roof mounted solar / 1 SolarEdge Energy Bank / New 225A main panel upgrade / New 125A load center
Start Date Submittal Complete Date Status  
10/29/2025 RESIDENTIAL SOLAR REVISION v.1 10/30/2025 REQUIRES RESUBMIT Review Details
08/26/2025 RESIDENTIAL SOLAR APP v.1 08/26/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0825-01144
Permite Description: installation of 11.89kw residential roof mounted solar / 1 SolarEdge Energy Bank / New 225A main panel upgrade / New 125A load center
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/12/2025 BULD - Electrical Clearance N/A Partial Pass 12/12/2025
Clearance TEP DGL derate at 10:10am. Partial pending solar. Please update plans and SolarAPP checklist to reflect derate.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0825-01144
Permit Description: installation of 11.89kw residential roof mounted solar / 1 SolarEdge Energy Bank / New 225A main panel upgrade / New 125A load center
Total Completed Inspections - 2
Date Description Inspector Results Comments
01/15/2026 BULD - Electrical Clearance Passed Passed CLEARANCE DGC 1/15/26.
01/15/2026 COT - RSOL - Electrical Final Solar Project Passed Passed CLEARANCE DGC 1/15/26.

Documents

File Name Document Type  
CHECKLIST A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PV PLANS_V1.PDF DOCUMENTS VIEW
SPECS_V1.PDF DOCUMENTS VIEW