Permit: TC-SOL-0825-01139
Permit Details
Apply Date:
08/25/2025
Applicant:
Description:
INSTALLATION OF A 12.15kWPV SYSTEM, 1-TESLA POWERWALL-3 BATTERY, 1-200A TESLA BACKUP SWITCH; 225A MAIN SERVICE PANEL UPGRADE
Permit Reviews
Permit Number - TC-SOL-0825-01139
Permit Status: Inspections
Permit Description: INSTALLATION OF A 12.15kWPV SYSTEM, 1-TESLA POWERWALL-3 BATTERY, 1-200A TESLA BACKUP SWITCH; 225A MAIN SERVICE PANEL UPGRADE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/25/2025 | RESIDENTIAL SOLAR APP v.1 | 08/25/2025 | APPROVED |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0825-01139
Permit Description: INSTALLATION OF A 12.15kWPV SYSTEM, 1-TESLA POWERWALL-3 BATTERY, 1-200A TESLA BACKUP SWITCH; 225A MAIN SERVICE PANEL UPGRADE
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC/DGL/BAT. 10/27/2025 | |
| 10/27/2025 | COT - RSOL - Electrical Final Solar Project | Passed |