Solar
Apply Date:
08/20/2025
Applicant:
MATT Davis
Description:
REV. 1: 12/11/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 19 MODULES - SYSTEM SIZE STC (7.79 kW DC / 6.00 kW AC)

Permit Reviews

Permit Number - TC-SOL-0825-01118
Permit Status: Inspections
Permit Description: REV. 1: 12/11/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 19 MODULES - SYSTEM SIZE STC (7.79 kW DC / 6.00 kW AC)
Start Date Submittal Complete Date Status  
12/11/2025 RESIDENTIAL SOLAR REVISION v.1 12/11/2025 APPROVED Review Details
08/20/2025 RESIDENTIAL SOLAR APP v.1 08/20/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0825-01118
Permite Description: REV. 1: 12/11/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 19 MODULES - SYSTEM SIZE STC (7.79 kW DC / 6.00 kW AC)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/09/2025 COT - RSOL - Electrical Final Solar Project N/A Re-inspection required Plans and solar app calls for SOLAREDGE Inverter. Photos do not match plans, completely different equipment with Battery. Please resubmit with proper plans and solar app approval.
12/09/2025 BULD - Electrical Clearance N/A Re-inspection required Plans and solar app calls for SOLAREDGE Inverter. Photos do not match plans, completely different equipment with Battery. Please resubmit with proper plans and solar app approval.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0825-01118
Permit Description: REV. 1: 12/11/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 19 MODULES - SYSTEM SIZE STC (7.79 kW DC / 6.00 kW AC)
Total Completed Inspections - 2
Date Description Inspector Results Comments
12/11/2025 COT - RSOL - Electrical Final Solar Project Passed 12/11/2025
Approved per updated plan set and SolarAPP checklist. Going forward, upload clear photos of all wire sizes at each equipment since some photos are difficult to verify. The more photos the better to verify against plans and checklist.
12/11/2025 BULD - Electrical Clearance Passed 12/11/2025
Clearance to TEP DGC/BAT.

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20251210-9-1594-455-A (1)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-MIKE - TRACY YAGO UPDATED PLANS_V1.PDF DOCUMENTS VIEW
MIKE - TRACY YAGO INSPECTION PHOTOS_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER PLAN SET - SOLARAPP CHECKLIST_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PERMIT FOR - TRACY YAGO - 07-21-2025_V1.PDF DOCUMENTS VIEW
EQUIPMENT SPECIFICATIONS_V1.PDF DOCUMENTS VIEW
SOLARAPP INSPECTION CHECKILIST_V1.PDF DOCUMENTS VIEW