Permit: TC-SOL-0824-00458
Permit Details
Apply Date:
08/28/2024
Applicant:
Gilberto Sanchez
Description:
SolarApp+ ID: SA20240828-9-1136-7097-A 6.150kW DC/ 4.875 kW AC PV SYSTEM (15) SEG SOLAR SEG-410-BMD-TB MODULES (15) ENPHASE ENERGY IQ8M-72-2-US INVERTER
Permit Reviews
Permit Number - TC-SOL-0824-00458
Permit Status: Issued
Permit Description: SolarApp+ ID: SA20240828-9-1136-7097-A
6.150kW DC/ 4.875 kW AC PV SYSTEM
(15) SEG SOLAR SEG-410-BMD-TB MODULES
(15) ENPHASE ENERGY IQ8M-72-2-US INVERTER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/29/2024 | RESIDENTIAL SOLAR APP v.1 | 08/29/2024 | APPROVED |
| 09/25/2024 | RESIDENTIAL SOLAR REVISION v.1 | 09/25/2024 | APPROVED |
Completed Inspections
Permit Status: Issued
Permit Number: TC-SOL-0824-00458
Permit Description: SolarApp+ ID: SA20240828-9-1136-7097-A
6.150kW DC/ 4.875 kW AC PV SYSTEM
(15) SEG SOLAR SEG-410-BMD-TB MODULES
(15) ENPHASE ENERGY IQ8M-72-2-US INVERTER
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2024 | COT - RSOL - Electrical Final Solar Project | Passed | Approved- DGC Clearance to TEP is required for the solar meter | |
| 09/17/2024 | BULD - Electrical Clearance | Passed | Approved- DGC Clearance to TEP is required for the solar meter |