Permit: TC-SOL-0824-00447
Permit Details
Apply Date:
08/26/2024
Applicant:
Inty Ops
Description:
Solarapp approved installation of a 7.6 KW PV System
Permit Reviews
Permit Number - TC-SOL-0824-00447
Permit Status: Complete
Permit Description: Solarapp approved installation of a 7.6 KW PV System
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/27/2024 | RESIDENTIAL SOLAR APP v.1 | 08/27/2024 | APPROVED |
| 09/11/2024 | RESIDENTIAL SOLAR REVISION v.1 | 09/11/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0824-00447
Permite Description: Solarapp approved installation of a 7.6 KW PV System
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | Called Uzi Uribe at 602-875-3970 at 7:37 am, no response. No pictures in files, needs inspection |
| 10/30/2024 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | Called Uzi Uribe at 602-875-3970 at 7:37 am, no response. No pictures in files, needs inspection |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0824-00447
Permit Description: Solarapp approved installation of a 7.6 KW PV System
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
| 11/04/2024 | COT - RSOL - Electrical Final Solar Project | Passed |