Permit Details

Status:
Complete
Type:
Solar
Address:
105 E MOHAVE RD
Address NEW:
105 E MOHAVE RD
Apply Date:
08/16/2024
Applicant:
Gilberto Sanchez
Description:
Due to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. Approval ID: SA20240815-9-1069-7097-A 9.315 kW DC/ 7.475 kW AC PV SYSTEM (23) SEG SOLAR-405-BMD-TB MODULES (23) ENPHASE ENERGY IQ8M-72-2-US INVERTERS

Permit Reviews

Permit Number - TC-SOL-0824-00396
Permit Status: Complete
Permit Description: Due to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. Approval ID: SA20240815-9-1069-7097-A 9.315 kW DC/ 7.475 kW AC PV SYSTEM (23) SEG SOLAR-405-BMD-TB MODULES (23) ENPHASE ENERGY IQ8M-72-2-US INVERTERS
Start Date Submittal Complete Date Status  
10/24/2024 RESIDENTIAL SOLAR v.2 11/24/2024 APPROVED Review Details
08/19/2024 RESIDENTIAL SOLAR v.1 09/20/2024 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-SOL-0824-00396
Permit Description: Due to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. Approval ID: SA20240815-9-1069-7097-A 9.315 kW DC/ 7.475 kW AC PV SYSTEM (23) SEG SOLAR-405-BMD-TB MODULES (23) ENPHASE ENERGY IQ8M-72-2-US INVERTERS
Total Completed Inspections - 2
Date Description Inspector Results Comments
12/13/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter
12/13/2024 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MOD1_(08-23)RDX12418 WILLIAM CARTERRESPONSE SHEET_V2.PDF DOCUMENTS VIEW