Permit Details

Status:
Complete
Type:
Solar
Apply Date:
08/02/2024
Applicant:
Hailey McGraw
Description:
Due to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home 9.2 kW DC System - Roof Mount PV

Permit Reviews

Permit Number - TC-SOL-0824-00331
Permit Status: Complete
Permit Description: Due to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home 9.2 kW DC System - Roof Mount PV
Start Date Submittal Complete Date Status  
08/30/2024 RESIDENTIAL SOLAR APP v.1 08/30/2024 APPROVED Review Details
08/05/2024 RESIDENTIAL SOLAR v.1 08/23/2024 APPROVED Review Details

Conditions

Permit Number - TC-SOL-0824-00331
Permit Status: Complete
Permit Description: Due to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home 9.2 kW DC System - Roof Mount PV
Date Description Comments
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Complete
Permit Number: TC-SOL-0824-00331
Permit Description: Due to the fact that this project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home 9.2 kW DC System - Roof Mount PV
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/16/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter
09/16/2024 COT - RSOL - Electrical Final Solar Project Passed