Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Solar
Address NEW:
6868 E PASEO BERCEO
Apply Date:
07/24/2025
Applicant:
Hailey McGaw
Description:
Revision 1: 09/18/2025 -- THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (19) NEW PHOTOVOLTAIC MODULES · (19) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (31) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING

Permit Reviews

Permit Number - TC-SOL-0725-00999
Permit Status: Inspections
Permit Description: Revision 1: 09/18/2025 -- THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (19) NEW PHOTOVOLTAIC MODULES · (19) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (31) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Start Date Submittal Complete Date Status  
08/01/2025 RESIDENTIAL SOLAR REVISION v.1 08/28/2025 APPROVED Review Details
07/24/2025 RESIDENTIAL SOLAR APP v.1 07/24/2025 APPROVED Review Details
08/01/2025 RESIDENTIAL SOLAR REVISION v.1 08/01/2025 IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TC-SOL-0725-00999
Permit Status: Inspections
Permit Description: Revision 1: 09/18/2025 -- THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (19) NEW PHOTOVOLTAIC MODULES · (19) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (31) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Total Outstanding Activity Conditions - 2
Date Name
07/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/13/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0725-00999
Permit Description: Revision 1: 09/18/2025 -- THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (19) NEW PHOTOVOLTAIC MODULES · (19) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (31) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Total Completed Inspections - 2
Date Description Inspector Results Comments
08/13/2025 COT - RSOL - Electrical Final Solar Project Passed
08/13/2025 BULD - Electrical Clearance Passed Approved solar -DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVAL-DOCUMENT-SA20250724-9-1007-3924-B_V1.PDF DOCUMENTS VIEW
APPROVAL-UPLOADS-SA20250724-9-1007-3924-B_V1.PDF DOCUMENTS VIEW
CONS-AZ-R25063_GRIJALVA, CHRISTIAN_PLANS REV1_V1.PDF DOCUMENTS VIEW
APPROVAL-DOCUMENT-SA20250724-9-1007-3924-A_V1.PDF DOCUMENTS VIEW
APPROVAL-UPLOADS-SA20250724-9-1007-3924-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-AZ-R25063_GRIJALVA, CHRISTIAN_PLANS_V1.PDF DOCUMENTS VIEW