Permit: TC-SOL-0725-00976
Permit Details
Status:
Complete
Type:
Solar
Address:
9512 E BARRUDEAN HILLS ST
Address NEW:
9512 E BARRUDEAN HILLS ST
Apply Date:
07/16/2025
Applicant:
Hailey McGaw
Description:
THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (30) NEW PHOTOVOLTAIC MODULES · (30) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW MAIN PANEL UPGRADE · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (64) NEW PHOTOVOLTAIC ROOF MOUNTING
Permit Reviews
Permit Number - TC-SOL-0725-00976
Permit Status: Complete
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING:
· (30) NEW PHOTOVOLTAIC MODULES
· (30) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL
· (01) NEW UTILITY DG METER SOCKET
· (01) NEW UTILITY DG DISCONNECT SWITCH
· (01) NEW MAIN PANEL UPGRADE
· (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER
· (64) NEW PHOTOVOLTAIC ROOF MOUNTING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/16/2025 | RESIDENTIAL SOLAR APP v.1 | 07/16/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0725-00976
Permite Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING:
· (30) NEW PHOTOVOLTAIC MODULES
· (30) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL
· (01) NEW UTILITY DG METER SOCKET
· (01) NEW UTILITY DG DISCONNECT SWITCH
· (01) NEW MAIN PANEL UPGRADE
· (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER
· (64) NEW PHOTOVOLTAIC ROOF MOUNTING
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 12:50pm Pending solar final |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0725-00976
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING:
· (30) NEW PHOTOVOLTAIC MODULES
· (30) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL
· (01) NEW UTILITY DG METER SOCKET
· (01) NEW UTILITY DG DISCONNECT SWITCH
· (01) NEW MAIN PANEL UPGRADE
· (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER
· (64) NEW PHOTOVOLTAIC ROOF MOUNTING
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 08/29/2025 | COT - RSOL - Electrical Final Solar Project | Passed |