Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Solar
Apply Date:
07/16/2025
Applicant:
Hailey McGaw
Description:
THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (30) NEW PHOTOVOLTAIC MODULES · (30) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW MAIN PANEL UPGRADE · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (64) NEW PHOTOVOLTAIC ROOF MOUNTING

Permit Reviews

Permit Number - TC-SOL-0725-00976
Permit Status: Complete
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (30) NEW PHOTOVOLTAIC MODULES · (30) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW MAIN PANEL UPGRADE · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (64) NEW PHOTOVOLTAIC ROOF MOUNTING
Start Date Submittal Complete Date Status  
07/16/2025 RESIDENTIAL SOLAR APP v.1 07/16/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-SOL-0725-00976
Permite Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (30) NEW PHOTOVOLTAIC MODULES · (30) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW MAIN PANEL UPGRADE · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (64) NEW PHOTOVOLTAIC ROOF MOUNTING
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/28/2025 BULD - Electrical Clearance N/A Partial Pass Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 12:50pm
Pending solar final

Completed Inspections

Permit Status: Complete
Permit Number: TC-SOL-0725-00976
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING: · (30) NEW PHOTOVOLTAIC MODULES · (30) NEW DC/AC INVERTER(S) · (01) NEW PHOTOVOLTAIC AC COMBINER PANEL · (01) NEW UTILITY DG METER SOCKET · (01) NEW UTILITY DG DISCONNECT SWITCH · (01) NEW MAIN PANEL UPGRADE · (01) NEW PHOTOVOLTAIC BACK-FEED BREAKER · (64) NEW PHOTOVOLTAIC ROOF MOUNTING
Total Completed Inspections - 2
Date Description Inspector Results Comments
08/29/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter
08/29/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20250716-9-981-3924-A_V1.PDF DOCUMENTS VIEW
APPROVAL-UPLOADS-SA20250716-9-981-3924-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-AZ-R25057_PIERCE, JILL_PLANS_V1.PDF DOCUMENTS VIEW