Permit: TC-SOL-0725-00959
Permit Details
Apply Date:
07/14/2025
Applicant:
Inty Ops
Description:
Installation of a 11.50 KW AC PV SYSTEM+ battery Integrated
Permit Reviews
Permit Number - TC-SOL-0725-00959
Permit Status: Inspections
Permit Description: Installation of a 11.50 KW AC PV SYSTEM+ battery Integrated
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/24/2025 | RESIDENTIAL SOLAR APP v.3 | 07/24/2025 | APPROVED |
| 07/15/2025 | RESIDENTIAL SOLAR APP v.1 | 07/15/2025 | REQUIRES RESUBMIT |
| 07/15/2025 | RESIDENTIAL SOLAR APP v.2 | 07/15/2025 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0725-00959
Permite Description: Installation of a 11.50 KW AC PV SYSTEM+ battery Integrated
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Not Ready | Not ready called in Tesla switch. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0725-00959
Permit Description: Installation of a 11.50 KW AC PV SYSTEM+ battery Integrated
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2025 | BULD - Electrical Clearance | Passed | Approved solar with PW3 - DGC/BAT Clearance to TEP is required for the solar meter | |
| 08/26/2025 | COT - RSOL - Electrical Final Solar Project | Passed |