Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Solar
Address NEW:
2103 E MABEL ST UNIT 1
Apply Date:
07/14/2025
Applicant:
Inty Ops
Description:
Installation of a 11.50 KW AC PV SYSTEM+ battery Integrated

Permit Reviews

Permit Number - TC-SOL-0725-00959
Permit Status: Inspections
Permit Description: Installation of a 11.50 KW AC PV SYSTEM+ battery Integrated
Start Date Submittal Complete Date Status  
07/24/2025 RESIDENTIAL SOLAR APP v.3 07/24/2025 APPROVED Review Details
07/15/2025 RESIDENTIAL SOLAR APP v.1 07/15/2025 REQUIRES RESUBMIT Review Details
07/15/2025 RESIDENTIAL SOLAR APP v.2 07/15/2025 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0725-00959
Permite Description: Installation of a 11.50 KW AC PV SYSTEM+ battery Integrated
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/19/2025 COT - RSOL - Electrical Final Solar Project N/A Not Ready Not ready called in Tesla switch.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0725-00959
Permit Description: Installation of a 11.50 KW AC PV SYSTEM+ battery Integrated
Total Completed Inspections - 2
Date Description Inspector Results Comments
08/26/2025 BULD - Electrical Clearance Passed Approved solar with PW3 - DGC/BAT Clearance to TEP is required for the solar meter
08/26/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20250724-9-1005-1414-A_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANSET_GEORGE HARRISON_R4_V3.PDF DOCUMENTS VIEW
DATA SHEET GEORGE UNIT 1_V3.PDF DOCUMENTS VIEW