Permit: TC-SOL-0725-00943
Permit Details
Apply Date:
07/10/2025
Applicant:
Project Manager
Description:
Rev. 2: 09/02/2025 -- Rev. 1: 08/21/2025 -- Installation of a 4.150kw dc system/1 Tesla Battery
Permit Reviews
Permit Number - TC-SOL-0725-00943
Permit Status: Complete
Permit Description: Rev. 2: 09/02/2025 --
Rev. 1: 08/21/2025 --
Installation of a 4.150kw dc system/1 Tesla Battery
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/21/2025 | RESIDENTIAL SOLAR REVISION v.1 | 08/21/2025 | APPROVED |
| 07/10/2025 | RESIDENTIAL SOLAR APP v.1 | 07/10/2025 | APPROVED |
| 09/02/2025 | RESIDENTIAL SOLAR REVISION v.1 | 09/02/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0725-00943
Permite Description: Rev. 2: 09/02/2025 --
Rev. 1: 08/21/2025 --
Installation of a 4.150kw dc system/1 Tesla Battery
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2025 | BULD - Electrical Clearance | N/A | Not Ready | |
| 08/22/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | DENIED via pics - please provide a solid surface under PW 3 per installation manual |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0725-00943
Permit Description: Rev. 2: 09/02/2025 --
Rev. 1: 08/21/2025 --
Installation of a 4.150kw dc system/1 Tesla Battery
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2025 | BULD - Electrical Clearance | Passed | Approved solar with PW3 per pics - DGC/BAT Clearance to TEP is required for the solar meter | |
| 09/03/2025 | COT - RSOL - Electrical Final Solar Project | Passed |