Permit: TC-SOL-0724-00314
Permit Details
Apply Date:
07/31/2024
Applicant:
Gilberto Sanchez
Description:
Current Approval ID: SA20240731-9-981-7097-A 7.790 kW DC/ 6.175 kW AC PV SYSTEM<br /> (19) SEG SOLAR SEG-410-BMD-TB MODULES<br /> (19) ENPHASE ENERGY IQ8M-72-2-US<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
Permit Reviews
Permit Number - TC-SOL-0724-00314
Permit Status: Complete
Permit Description: Current Approval ID: SA20240731-9-981-7097-A
7.790 kW DC/ 6.175 kW AC PV SYSTEM<br /> (19) SEG SOLAR SEG-410-BMD-TB MODULES<br /> (19) ENPHASE ENERGY IQ8M-72-2-US<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/31/2024 | RESIDENTIAL SOLAR APP v.1 | 08/01/2024 | APPROVED |
| 09/19/2024 | RESIDENTIAL SOLAR REVISION v.1 | 09/19/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0724-00314
Permite Description: Current Approval ID: SA20240731-9-981-7097-A
7.790 kW DC/ 6.175 kW AC PV SYSTEM<br /> (19) SEG SOLAR SEG-410-BMD-TB MODULES<br /> (19) ENPHASE ENERGY IQ8M-72-2-US<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 12:35 Pending solar |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0724-00314
Permit Description: Current Approval ID: SA20240731-9-981-7097-A
7.790 kW DC/ 6.175 kW AC PV SYSTEM<br /> (19) SEG SOLAR SEG-410-BMD-TB MODULES<br /> (19) ENPHASE ENERGY IQ8M-72-2-US<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
| 11/08/2024 | COT - RSOL - Electrical Final Solar Project | Passed |