Permit: TC-SOL-0724-00305
Permit Details
Apply Date:
07/30/2024
Applicant:
Gilberto Sanchez
Description:
SolarApp ID: SA20240730-9-967-7097-A 5.330 kW DC/ 4.225 kW AC PV SYSTEM<br /> (13) SEG SOLAR SEG-410-BMD-TB MODULES <br /> (13) ENPHASE ENERGY IQ8M-72-2-US INVERTERS<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
Permit Reviews
Permit Number - TC-SOL-0724-00305
Permit Status: Complete
Permit Description: SolarApp ID: SA20240730-9-967-7097-A
5.330 kW DC/ 4.225 kW AC PV SYSTEM<br /> (13) SEG SOLAR SEG-410-BMD-TB MODULES <br /> (13) ENPHASE ENERGY IQ8M-72-2-US INVERTERS<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/30/2024 | RESIDENTIAL SOLAR APP v.1 | 07/30/2024 | APPROVED |
| 10/17/2024 | RESIDENTIAL SOLAR REVISION v.1 | 10/17/2024 | APPROVED |
| 08/26/2024 | RESIDENTIAL SOLAR REVISION v.1 | 08/26/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0724-00305
Permite Description: SolarApp ID: SA20240730-9-967-7097-A
5.330 kW DC/ 4.225 kW AC PV SYSTEM<br /> (13) SEG SOLAR SEG-410-BMD-TB MODULES <br /> (13) ENPHASE ENERGY IQ8M-72-2-US INVERTERS<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 10:15am Pending solar |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0724-00305
Permit Description: SolarApp ID: SA20240730-9-967-7097-A
5.330 kW DC/ 4.225 kW AC PV SYSTEM<br /> (13) SEG SOLAR SEG-410-BMD-TB MODULES <br /> (13) ENPHASE ENERGY IQ8M-72-2-US INVERTERS<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the Solar meter | |
| 11/19/2024 | COT - RSOL - Electrical Final Solar Project | Passed |