Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Complete
Type:
Solar
Address:
1830 W LESTER ST
Address NEW:
1830 W LESTER ST
Apply Date:
07/30/2024
Applicant:
Gilberto Sanchez
Description:
SolarApp ID: SA20240730-9-967-7097-A 5.330 kW DC/ 4.225 kW AC PV SYSTEM<br /> (13) SEG SOLAR SEG-410-BMD-TB MODULES <br /> (13) ENPHASE ENERGY IQ8M-72-2-US INVERTERS<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT

Permit Reviews

Permit Number - TC-SOL-0724-00305
Permit Status: Complete
Permit Description: SolarApp ID: SA20240730-9-967-7097-A 5.330 kW DC/ 4.225 kW AC PV SYSTEM<br /> (13) SEG SOLAR SEG-410-BMD-TB MODULES <br /> (13) ENPHASE ENERGY IQ8M-72-2-US INVERTERS<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
Start Date Submittal Complete Date Status  
07/30/2024 RESIDENTIAL SOLAR APP v.1 07/30/2024 APPROVED Review Details
10/17/2024 RESIDENTIAL SOLAR REVISION v.1 10/17/2024 APPROVED Review Details
08/26/2024 RESIDENTIAL SOLAR REVISION v.1 08/26/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-SOL-0724-00305
Permite Description: SolarApp ID: SA20240730-9-967-7097-A 5.330 kW DC/ 4.225 kW AC PV SYSTEM<br /> (13) SEG SOLAR SEG-410-BMD-TB MODULES <br /> (13) ENPHASE ENERGY IQ8M-72-2-US INVERTERS<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/11/2024 BULD - Electrical Clearance N/A Partial Pass Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 10:15am
Pending solar

Completed Inspections

Permit Status: Complete
Permit Number: TC-SOL-0724-00305
Permit Description: SolarApp ID: SA20240730-9-967-7097-A 5.330 kW DC/ 4.225 kW AC PV SYSTEM<br /> (13) SEG SOLAR SEG-410-BMD-TB MODULES <br /> (13) ENPHASE ENERGY IQ8M-72-2-US INVERTERS<br /> MAIN SERVICE PANEL UPGRADE 225A BUSBAR/200A MAIN SERVICE DISCONNECT
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/19/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the Solar meter
11/19/2024 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
10148-161748-262368-11365-APPROVALDOCUMENT_V1.PDF DOCUMENTS VIEW
10148-161748-262368-11366-APPROVALUPLOADS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MOD2_RDX12443_MATTHEWS, EDWARDCOVER LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-RDX12443_MATTHEWS, EDWARD_REV2COVER LETTER_V1.PDF DOCUMENTS VIEW
APPROVAL-DOCUMENT-SA20240730-9-967-7097-A_V1.PDF DOCUMENTS VIEW
APPROVAL-UPLOADS-SA20240730-9-967-7097-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-RDX12443_MATTHEWS, EDWARD_V1.PDF DOCUMENTS VIEW