Permit: TC-SOL-0724-00148
Permit Details
Apply Date:
07/01/2024
Applicant:
TFS Solar
Description:
SolarAPP: Roof mount 5.74 kW DC photovoltaic solar system; 14 AC modules, 2 branches, PV subpanel, 30A PV breaker on 225A bus with 200A MCB
Permit Reviews
Permit Number - TC-SOL-0724-00148
Permit Status: Complete
Permit Description: SolarAPP: Roof mount 5.74 kW DC photovoltaic solar system; 14 AC modules, 2 branches, PV subpanel, 30A PV breaker on 225A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2024 | RESIDENTIAL SOLAR APP v.1 | 07/14/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0724-00148
Permite Description: SolarAPP: Roof mount 5.74 kW DC photovoltaic solar system; 14 AC modules, 2 branches, PV subpanel, 30A PV breaker on 225A bus with 200A MCB
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass, verbal clearance to TEP. INCR 9/25/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0724-00148
Permit Description: SolarAPP: Roof mount 5.74 kW DC photovoltaic solar system; 14 AC modules, 2 branches, PV subpanel, 30A PV breaker on 225A bus with 200A MCB
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2024 | BULD - Electrical Clearance | Passed | 10/16/24 - CLEAR DGC | |
| 10/16/2024 | COT - RSOL - Electrical Final Solar Project | Passed | Project complete. | |
| 10/16/2024 | RSBU - Building Progress | Passed | This is the BUILDING FINAL for this PV project. CLOSE PERMIT |