Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Solar
Address NEW:
9728 E CARR PEAK TR
Apply Date:
06/16/2025
Applicant:
Marytine Ramos
Description:
Installation of a 8.20kw PV System

Permit Reviews

Permit Number - TC-SOL-0625-00804
Permit Status: Complete
Permit Description: Installation of a 8.20kw PV System
Start Date Submittal Complete Date Status  
06/16/2025 RESIDENTIAL SOLAR APP v.1 06/16/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-SOL-0625-00804
Permit Description: Installation of a 8.20kw PV System
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/26/2025 BULD - Electrical Clearance Passed 6.26.26 Inspector provided DGC code on 7/14 - added by JConrad
PV system is installed according to plans. All conductors are appropriately sized, panels are braced/secured, neutrals and groundings present.
06/26/2025 COT - RSOL - Electrical Final Solar Project Passed 6.26.26
PV system is installed according to plans. All conductors are appropriately sized, panels are braced/secured, neutrals and groundings present.

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20250616-9-809-1584-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-OUR94292-BENNETT-CAD 1_V1.PDF DOCUMENTS VIEW
SPECS SHEETS_V1.PDF DOCUMENTS VIEW