Permit: TC-SOL-0526-00315
Permit Details
Apply Date:
05/05/2026
Applicant:
TFS Solar
Description:
Roof mount 10.44 kW DC photovoltaic solar system; 24 modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 3 strings. 1 battery expansion pack, (no inverter). 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup. Replace existing 200A meter base.
Permit Reviews
Permit Number - TC-SOL-0526-00315
Permit Status: Inspections
Permit Description: Roof mount 10.44 kW DC photovoltaic solar system; 24 modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 3 strings. 1 battery expansion pack, (no inverter). 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Replace existing 200A meter base.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2026 | RESIDENTIAL SOLAR APP v.1 | N/A | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0526-00315
Permite Description: Roof mount 10.44 kW DC photovoltaic solar system; 24 modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 3 strings. 1 battery expansion pack, (no inverter). 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Replace existing 200A meter base.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/22/2026 | BULD - Electrical Clearance | N/A | Partial Pass |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0526-00315
Permit Description: Roof mount 10.44 kW DC photovoltaic solar system; 24 modules; 27 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 3 strings. 1 battery expansion pack, (no inverter). 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Replace existing 200A meter base.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2026 | BULD - Electrical Clearance | Passed | DGC/bat approved | |
| 06/29/2026 | COT - RSOL - Electrical Final Solar Project | Passed |