Permit: TC-SOL-0525-00719
Permit Details
Apply Date:
05/30/2025
Applicant:
Gilberto Sanchez
Description:
Approval ID: SA20250530-9-722-7097-A NEW PV SYSTEM: DC STC: 12.150kW/ AC: 8.700kW (N) 30 - JA SOLAR JAM54S31-405/MR (405W) MODULES (N) 30 - ENPHASE ENERGY IQ8PLUS-72-M-US [240V][SI1-SB] MICRO INVERTERS (E) 200A MAIN SERVICE PANEL WITH (N) 175A MAIN BREAKER (N) 60A NON-FUSED UTILITY DG DISCONNECT SWITCH (SIEMENS GNF222RLZA), 240VAC (N) DG METER SOCKET (100A MILBANK U5929-XL-INS, 600V FORM 2S, 120/240V) (N) ENPHASE IQ COMBINER BOX 4 (X2-IQ-AM1-240-4) DERATE: (E) 200A MAIN BREAKER TO BE DERATED TO (N) 175A TO ALLOW BACKFEED OF 50A
Permit Reviews
Permit Number - TC-SOL-0525-00719
Permit Status: Complete
Permit Description: Approval ID: SA20250530-9-722-7097-A
NEW PV SYSTEM: DC STC: 12.150kW/ AC: 8.700kW
(N) 30 - JA SOLAR JAM54S31-405/MR (405W) MODULES
(N) 30 - ENPHASE ENERGY IQ8PLUS-72-M-US [240V][SI1-SB] MICRO
INVERTERS
(E) 200A MAIN SERVICE PANEL WITH (N) 175A MAIN BREAKER (N) 60A NON-FUSED UTILITY DG DISCONNECT SWITCH (SIEMENS GNF222RLZA), 240VAC
(N) DG METER SOCKET (100A MILBANK U5929-XL-INS, 600V FORM 2S, 120/240V)
(N) ENPHASE IQ COMBINER BOX 4 (X2-IQ-AM1-240-4)
DERATE: (E) 200A MAIN BREAKER TO BE DERATED TO (N) 175A TO ALLOW BACKFEED OF 50A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/30/2025 | RESIDENTIAL SOLAR APP v.1 | 05/30/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0525-00719
Permit Description: Approval ID: SA20250530-9-722-7097-A
NEW PV SYSTEM: DC STC: 12.150kW/ AC: 8.700kW
(N) 30 - JA SOLAR JAM54S31-405/MR (405W) MODULES
(N) 30 - ENPHASE ENERGY IQ8PLUS-72-M-US [240V][SI1-SB] MICRO
INVERTERS
(E) 200A MAIN SERVICE PANEL WITH (N) 175A MAIN BREAKER (N) 60A NON-FUSED UTILITY DG DISCONNECT SWITCH (SIEMENS GNF222RLZA), 240VAC
(N) DG METER SOCKET (100A MILBANK U5929-XL-INS, 600V FORM 2S, 120/240V)
(N) ENPHASE IQ COMBINER BOX 4 (X2-IQ-AM1-240-4)
DERATE: (E) 200A MAIN BREAKER TO BE DERATED TO (N) 175A TO ALLOW BACKFEED OF 50A
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC. 7/7/2025 | |
| 07/07/2025 | COT - RSOL - Electrical Final Solar Project | Passed |