Permit: TC-SOL-0525-00673
Permit Details
Apply Date:
05/20/2025
Applicant:
Inty Ops
Description:
REV B: changed the layout & strings REV A: PV strings have been modified Installation of a 7.60 kw pv ac system + MPU
Permit Reviews
Permit Number - TC-SOL-0525-00673
Permit Status: Complete
Permit Description: REV B: changed the layout & strings
REV A: PV strings have been modified
Installation of a 7.60 kw pv ac system + MPU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/20/2025 | RESIDENTIAL SOLAR APP v.1 | 05/20/2025 | APPROVED |
| 06/03/2025 | RESIDENTIAL SOLAR REVISION v.1 | 06/03/2025 | APPROVED |
| 06/06/2025 | RESIDENTIAL SOLAR REVISION v.1 | 06/06/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0525-00673
Permit Description: REV B: changed the layout & strings
REV A: PV strings have been modified
Installation of a 7.60 kw pv ac system + MPU
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2025 | BULD - Electrical Clearance | Passed | Passed solar final 7/31/25 CLEARANCE DGC | |
| 07/31/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Passed solar final 7/31/25 CLEARANCE DGC |