Permit: TC-SOL-0525-00655
Permit Details
Apply Date:
05/15/2025
Applicant:
TFS Solar
Description:
Rev. 1: 09/03/2025 -- Roof mount 5.66kW DC photovoltaic solar system; 13 AC modules, 2 branches, PV Combiner Box, 30A PV breaker on 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-SOL-0525-00655
Permit Status: Complete
Permit Description: Rev. 1: 09/03/2025 --
Roof mount 5.66kW DC photovoltaic
solar system; 13 AC modules, 2
branches, PV Combiner Box, 30A PV
breaker on 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/03/2025 | RESIDENTIAL SOLAR REVISION v.1 | 09/03/2025 | APPROVED |
| 05/15/2025 | RESIDENTIAL SOLAR APP v.1 | 05/15/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0525-00655
Permite Description: Rev. 1: 09/03/2025 --
Roof mount 5.66kW DC photovoltaic
solar system; 13 AC modules, 2
branches, PV Combiner Box, 30A PV
breaker on 200A bus with 200A MCB
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2025 | BULD - Electrical Clearance | N/A | Partial Pass | TEP CLEARANCE: DGL, called TEP @ 10:01. Partial pass. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0525-00655
Permit Description: Rev. 1: 09/03/2025 --
Roof mount 5.66kW DC photovoltaic
solar system; 13 AC modules, 2
branches, PV Combiner Box, 30A PV
breaker on 200A bus with 200A MCB
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2025 | COT - RSOL - Electrical Final Solar Project | Passed |