Permit: TC-SOL-0525-00613
Permit Details
Apply Date:
05/09/2025
Applicant:
Hailey McGaw
Description:
THIS PROJECT IS COMPRISED OF THE FOLLOWING: · NEW PHOTOVOLTAIC MODULES · NEW DC/AC INVERTER(S) · NEW PHOTOVOLTAIC AC COMBINER PANEL · NEW UTILITY DG METER SOCKET · NEW UTILITY DG DISCONNECT SWITCH · NEW MAIN BREAKER DERATE · NEW PHOTOVOLTAIC BACK-FEED BREAKER · NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Permit Reviews
Permit Number - TC-SOL-0525-00613
Permit Status: Complete
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING:
· NEW PHOTOVOLTAIC MODULES
· NEW DC/AC INVERTER(S) · NEW PHOTOVOLTAIC AC COMBINER PANEL
· NEW UTILITY DG METER SOCKET
· NEW UTILITY DG DISCONNECT SWITCH
· NEW MAIN BREAKER DERATE
· NEW PHOTOVOLTAIC BACK-FEED BREAKER
· NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/12/2025 | RESIDENTIAL SOLAR APP v.1 | 05/12/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0525-00613
Permit Description: THIS PROJECT IS COMPRISED OF THE FOLLOWING:
· NEW PHOTOVOLTAIC MODULES
· NEW DC/AC INVERTER(S) · NEW PHOTOVOLTAIC AC COMBINER PANEL
· NEW UTILITY DG METER SOCKET
· NEW UTILITY DG DISCONNECT SWITCH
· NEW MAIN BREAKER DERATE
· NEW PHOTOVOLTAIC BACK-FEED BREAKER
· NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED BONDING
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | BULD - Electrical Clearance | Passed | 6.25.25 PV modules installed as per plan. Verified via video. |
|
| 06/25/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 6.25.25 PV modules installed as per plan. Verified via video. |