Permit Details

Status:
Inspections
Type:
Solar
Address NEW:
2301 N CAMINO MATEO
Apply Date:
04/06/2026
Applicant:
chad
Description:
REV. 1: 06/09/2026 SolarAPP - Install a 7.92 kW DC rooftop solar electric system and install a new revenue meter enclosure and a new 200A main panel. Powerkill required with TEP.

Permit Reviews

Permit Number - TC-SOL-0426-00244
Permit Status: Inspections
Permit Description: REV. 1: 06/09/2026 SolarAPP - Install a 7.92 kW DC rooftop solar electric system and install a new revenue meter enclosure and a new 200A main panel. Powerkill required with TEP.
Start Date Submittal Complete Date Status  
04/07/2026 RESIDENTIAL SOLAR APP v.2 04/07/2026 REQUIRES RESUBMIT Review Details
04/09/2026 RESIDENTIAL SOLAR APP v.3 N/A APPROVED Review Details
06/08/2026 RESIDENTIAL SOLAR REVISION v.1 N/A REQUIRES RESUBMIT Review Details
06/09/2026 RESIDENTIAL SOLAR REVISION v.2 N/A APPROVED Review Details
04/07/2026 RESIDENTIAL SOLAR APP v.1 04/07/2026 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0426-00244
Permite Description: REV. 1: 06/09/2026 SolarAPP - Install a 7.92 kW DC rooftop solar electric system and install a new revenue meter enclosure and a new 200A main panel. Powerkill required with TEP.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/06/2026 COT - RSBU - Excavation/Rebar/Zoning N/A Not Applicable Passed

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0426-00244
Permit Description: REV. 1: 06/09/2026 SolarAPP - Install a 7.92 kW DC rooftop solar electric system and install a new revenue meter enclosure and a new 200A main panel. Powerkill required with TEP.
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/06/2026 COT - RSOL - Electrical Underground Solar Project Passed Passed
08/06/2026 COT - RSOL - Grounding/Bonding Solar Project Passed Passed
09/15/2026 BULD - Electrical Clearance Passed
09/15/2026 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-1_CONSTRUCTION_DRAWINGS_V3.PDF DOCUMENTS VIEW
RUIZ, ADRIAN_APPROVAL-DOCUMENT-SA20260406-9-227-53-A__V3.PDF DOCUMENTS VIEW
RUIZ, ADRIAN_APPROVAL-UPLOADS-SA20260406-9-227-53-A__V3.PDF DOCUMENTS VIEW