Permit Details

Status:
Inspections
Type:
Solar
Address:
5562 E TOWNER ST
Address NEW:
5562 E TOWNER ST
Apply Date:
04/30/2025
Applicant:
TFS Solar
Description:
Roof mount 8.70 kW DC photovoltaic solar system; 20 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.

Permit Reviews

Permit Number - TC-SOL-0425-00574
Permit Status: Inspections
Permit Description: Roof mount 8.70 kW DC photovoltaic solar system; 20 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Start Date Submittal Complete Date Status  
04/30/2025 RESIDENTIAL SOLAR APP v.1 04/30/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0425-00574
Permite Description: Roof mount 8.70 kW DC photovoltaic solar system; 20 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/03/2025 BULD - Electrical Clearance N/A Partial Pass 7.3.25
DGL for MSA verbal clearance to TEP on site at 9:08am
Partial Pass pending solar.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0425-00574
Permit Description: Roof mount 8.70 kW DC photovoltaic solar system; 20 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 2
Date Description Inspector Results Comments
07/09/2025 COT - RSOL - Electrical Final Solar Project Passed
07/09/2025 BULD - Electrical Clearance Passed Approved solar and PW3 - DGC/BAT Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-HELLER PAUL PV 8.70 KW STORAGE 13.5 KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW
HELLER PAUL APPROVAL-DOCUMENT-SA20250430-9-580-30-A_V1.PDF DOCUMENTS VIEW
HELLER PAUL SAPP SPECS APPROVAL-UPLOADS-SA20250430-9-580-30-A_V1.PDF DOCUMENTS VIEW