Permit: TC-SOL-0425-00574
Permit Details
Apply Date:
04/30/2025
Applicant:
TFS Solar
Description:
Roof mount 8.70 kW DC photovoltaic solar system; 20 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Permit Reviews
Permit Number - TC-SOL-0425-00574
Permit Status: Inspections
Permit Description: Roof mount 8.70 kW DC photovoltaic
solar system; 20 modules; 13.5 kWh
Storage, 1 Tesla Powerwall-3 battery
with integrated PV inverter with 2
strings. 200A bus with 200A MCB,
interconnection via PCS, Tesla
Backup Switch for whole home
backup.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/30/2025 | RESIDENTIAL SOLAR APP v.1 | 04/30/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0425-00574
Permite Description: Roof mount 8.70 kW DC photovoltaic
solar system; 20 modules; 13.5 kWh
Storage, 1 Tesla Powerwall-3 battery
with integrated PV inverter with 2
strings. 200A bus with 200A MCB,
interconnection via PCS, Tesla
Backup Switch for whole home
backup.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 7.3.25 DGL for MSA verbal clearance to TEP on site at 9:08am Partial Pass pending solar. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0425-00574
Permit Description: Roof mount 8.70 kW DC photovoltaic
solar system; 20 modules; 13.5 kWh
Storage, 1 Tesla Powerwall-3 battery
with integrated PV inverter with 2
strings. 200A bus with 200A MCB,
interconnection via PCS, Tesla
Backup Switch for whole home
backup.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 07/09/2025 | BULD - Electrical Clearance | Passed | Approved solar and PW3 - DGC/BAT Clearance to TEP is required for the solar meter |