Permit Details

Status:
Complete
Type:
Solar
Address NEW:
4091 E WHITE WATER DR
Apply Date:
04/21/2025
Applicant:
Michael Carrizoza
Description:
PV SOLAR INSTALL PLEASE DON'T MOVE THIS PROJECT TO FLOOD PERMIT REQUIREMENT IT DOES NOT NEED FLOOD PERMIT CHECK PICTURE I UPLOADED AS PROOF FROM FLOOD ZONE DEVELOPMENT FROM CITY OF TUCSON

Permit Reviews

Permit Number - TC-SOL-0425-00521
Permit Status: Complete
Permit Description: PV SOLAR INSTALL PLEASE DON'T MOVE THIS PROJECT TO FLOOD PERMIT REQUIREMENT IT DOES NOT NEED FLOOD PERMIT CHECK PICTURE I UPLOADED AS PROOF FROM FLOOD ZONE DEVELOPMENT FROM CITY OF TUCSON
Start Date Submittal Complete Date Status  
04/21/2025 RESIDENTIAL SOLAR APP v.1 04/21/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-SOL-0425-00521
Permite Description: PV SOLAR INSTALL PLEASE DON'T MOVE THIS PROJECT TO FLOOD PERMIT REQUIREMENT IT DOES NOT NEED FLOOD PERMIT CHECK PICTURE I UPLOADED AS PROOF FROM FLOOD ZONE DEVELOPMENT FROM CITY OF TUCSON
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/21/2025 BULD - Electrical Clearance N/A Partial Pass Partial pass. Verbal clearance to TEP DGL (MSA). Pending solar. 5/21/2025

Completed Inspections

Permit Status: Complete
Permit Number: TC-SOL-0425-00521
Permit Description: PV SOLAR INSTALL PLEASE DON'T MOVE THIS PROJECT TO FLOOD PERMIT REQUIREMENT IT DOES NOT NEED FLOOD PERMIT CHECK PICTURE I UPLOADED AS PROOF FROM FLOOD ZONE DEVELOPMENT FROM CITY OF TUCSON
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/06/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter
06/06/2025 COT - RSOL - Electrical Final Solar Project Passed