Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-SOL-0425-00502
Permit Details
Apply Date:
04/15/2025
Applicant:
Hailey McGraw
Description:
install 5.74kw residential roof mounted solar / New 125A load center / 1 SolarEdge Energy Bank
Permit Reviews
Permit Number - TC-SOL-0425-00502
Permit Status: Complete
Permit Description: install 5.74kw residential roof mounted solar / New 125A load center / 1 SolarEdge Energy Bank
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/16/2025 | RESIDENTIAL SOLAR APP v.1 | 04/16/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0425-00502
Permite Description: install 5.74kw residential roof mounted solar / New 125A load center / 1 SolarEdge Energy Bank
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 7.1.30 VERBAL CLEARANCE TO TEP onsite for MSA. Partial Pass pending solar. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0425-00502
Permit Description: install 5.74kw residential roof mounted solar / New 125A load center / 1 SolarEdge Energy Bank
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2025 | BULD - Electrical Clearance | Passed | Approved solar and battery - DGC/BAT Clearance to TEP is required for the solar meter | |
| 07/08/2025 | COT - RSOL - Electrical Final Solar Project | Passed |