Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Solar
Apply Date:
04/15/2025
Applicant:
Hailey McGraw
Description:
install 5.74kw residential roof mounted solar / New 125A load center / 1 SolarEdge Energy Bank

Permit Reviews

Permit Number - TC-SOL-0425-00502
Permit Status: Complete
Permit Description: install 5.74kw residential roof mounted solar / New 125A load center / 1 SolarEdge Energy Bank
Start Date Submittal Complete Date Status  
04/16/2025 RESIDENTIAL SOLAR APP v.1 04/16/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-SOL-0425-00502
Permite Description: install 5.74kw residential roof mounted solar / New 125A load center / 1 SolarEdge Energy Bank
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/01/2025 BULD - Electrical Clearance N/A Partial Pass 7.1.30
VERBAL CLEARANCE TO TEP onsite for MSA. Partial Pass pending solar.

Completed Inspections

Permit Status: Complete
Permit Number: TC-SOL-0425-00502
Permit Description: install 5.74kw residential roof mounted solar / New 125A load center / 1 SolarEdge Energy Bank
Total Completed Inspections - 2
Date Description Inspector Results Comments
07/08/2025 BULD - Electrical Clearance Passed Approved solar and battery - DGC/BAT Clearance to TEP is required for the solar meter
07/08/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
CHECKLIST A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANS_V1.PDF DOCUMENTS VIEW
STRUC_V1.PDF DOCUMENTS VIEW