Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Solar
Address NEW:
6326 E MALVERN ST
Apply Date:
03/23/2026
Applicant:
Project Manager
Description:
Rooftop Mounted Solar Energy System PV+ST 11 Q.PEAK DUO BLK ML-G10+ 410 solar modules 1 1707000-XX-Y {240V, 11.5kW} inverter 1 1707000-XX-Y {11.5kW} ESS System Size: 4.51 kW DC (11.51 kW AC)

Permit Reviews

Permit Number - TC-SOL-0326-00198
Permit Status: Inspections
Permit Description: Rooftop Mounted Solar Energy System PV+ST 11 Q.PEAK DUO BLK ML-G10+ 410 solar modules 1 1707000-XX-Y {240V, 11.5kW} inverter 1 1707000-XX-Y {11.5kW} ESS System Size: 4.51 kW DC (11.51 kW AC)
Start Date Submittal Complete Date Status  
03/25/2026 RESIDENTIAL SOLAR APP v.1 N/A APPROVED Review Details

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0326-00198
Permit Description: Rooftop Mounted Solar Energy System PV+ST 11 Q.PEAK DUO BLK ML-G10+ 410 solar modules 1 1707000-XX-Y {240V, 11.5kW} inverter 1 1707000-XX-Y {11.5kW} ESS System Size: 4.51 kW DC (11.51 kW AC)
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/08/2026 BULD - Electrical Clearance Passed 06/08/2026
Clearance TEP DGC/BAT. Verified SolarAPP checklist.
06/08/2026 COT - RSOL - Electrical Final Solar Project Passed 06/08/2026
Clearance TEP DGC/BAT. Verified SolarAPP checklist.

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20260323-9-180-4592-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-CE11498_PLANS_V1.PDF DOCUMENTS VIEW