Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Solar
Address:
5135 S 13TH AV
Address NEW:
5135 S 13TH AV
Apply Date:
03/20/2025
Applicant:
Inty Ops
Description:
Rev.1: We have reduced the number of modules in the project, decreasing the DC system size to 9.84 kW. Installation of a 7.60 KW AC PV System

Permit Reviews

Permit Number - TC-SOL-0325-00370
Permit Status: Issued
Permit Description: Rev.1: We have reduced the number of modules in the project, decreasing the DC system size to 9.84 kW. Installation of a 7.60 KW AC PV System
Start Date Submittal Complete Date Status  
06/18/2025 RESIDENTIAL SOLAR REVISION v.1 06/18/2025 APPROVED Review Details
03/21/2025 RESIDENTIAL SOLAR APP v.1 03/21/2025 APPROVED Review Details

Completed Inspections

Permit Status: Issued
Permit Number: TC-SOL-0325-00370
Permit Description: Rev.1: We have reduced the number of modules in the project, decreasing the DC system size to 9.84 kW. Installation of a 7.60 KW AC PV System
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/26/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter
06/26/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20250320-9-382-1414-B_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANSET_CHRISTIAN ANDRADE_R2_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER ANDRADE_V1.PDF DOCUMENTS VIEW
APPROVAL-DOCUMENT-SA20250320-9-382-1414-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANSET_CHRISTIAN ANDRADE_R1_V1.PDF DOCUMENTS VIEW
EQUIPMENT SPECIFICATION CHRISTIAN A_V1.PDF DOCUMENTS VIEW