Permit: TC-SOL-0325-00366
Permit Details
Apply Date:
03/20/2025
Applicant:
Hailey McGraw
Description:
REV B: 1. BOS location updated to the western side of the north wall 2. PM changed to new 125A Eaton 4.51 kW DC System- Roof Mount PV, existing system
Permit Reviews
Permit Number - TC-SOL-0325-00366
Permit Status: Inspections
Permit Description: REV B: 1. BOS location updated to the western side of the north wall
2. PM changed to new 125A Eaton
4.51 kW DC System- Roof Mount PV, existing system
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2025 | RESIDENTIAL SOLAR APP v.1 | 03/20/2025 | APPROVED |
| 05/05/2025 | RESIDENTIAL SOLAR REVISION v.1 | 05/05/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0325-00366
Permite Description: REV B: 1. BOS location updated to the western side of the north wall
2. PM changed to new 125A Eaton
4.51 kW DC System- Roof Mount PV, existing system
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 7.1.25 VERBAL CLEARANCE TO TEP GOR DGC/DGL MSA Partial pass pending solar |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0325-00366
Permit Description: REV B: 1. BOS location updated to the western side of the north wall
2. PM changed to new 125A Eaton
4.51 kW DC System- Roof Mount PV, existing system
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 07/03/2025 | COT - RSOL - Electrical Final Solar Project | Passed |