Permit: TC-SOL-0325-00284
Permit Details
Apply Date:
03/06/2025
Applicant:
TFS Solar
Description:
Roof mount 15.05kW DC photovoltaic solar system; 35 modules and microinverters, 4 branches, PV combiner box. Interconnection via 80A meter socket adapter with integrated 80A breaker to 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-SOL-0325-00284
Permit Status: Complete
Permit Description: Roof mount 15.05kW DC photovoltaic
solar system; 35 modules and
microinverters, 4 branches, PV
combiner box. Interconnection via 80A
meter socket adapter with integrated
80A breaker to 200A bus with 200A
MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2025 | RESIDENTIAL SOLAR APP v.1 | 03/06/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0325-00284
Permite Description: Roof mount 15.05kW DC photovoltaic
solar system; 35 modules and
microinverters, 4 branches, PV
combiner box. Interconnection via 80A
meter socket adapter with integrated
80A breaker to 200A bus with 200A
MCB
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | BULD - Electrical Clearance | N/A | Not Applicable | 6/10/25 Duplicate, Tony Guasp passed the DGC. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0325-00284
Permit Description: Roof mount 15.05kW DC photovoltaic
solar system; 35 modules and
microinverters, 4 branches, PV
combiner box. Interconnection via 80A
meter socket adapter with integrated
80A breaker to 200A bus with 200A
MCB
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 06/10/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |