Permit: TC-SOL-0225-00226
Permit Details
Apply Date:
02/24/2025
Applicant:
TFS Solar
Description:
Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Permit Reviews
Permit Number - TC-SOL-0225-00226
Permit Status: Inspections
Permit Description: Roof mount 6.09 kW DC photovoltaic
solar system; 14 modules; 13.5 kWh
Storage, 1 Tesla Powerwall-3 battery
with integrated PV inverter with 4
strings. 200A bus with 200A MCB,
interconnection via PCS, Tesla
Backup Switch for whole home
backup.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/25/2025 | RESIDENTIAL SOLAR APP v.1 | 02/25/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0225-00226
Permite Description: Roof mount 6.09 kW DC photovoltaic
solar system; 14 modules; 13.5 kWh
Storage, 1 Tesla Powerwall-3 battery
with integrated PV inverter with 4
strings. 200A bus with 200A MCB,
interconnection via PCS, Tesla
Backup Switch for whole home
backup.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass. Clearance for TEP DGL. (Tesla Backup Switch) 5/15/2025 |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0225-00226
Permit Description: Roof mount 6.09 kW DC photovoltaic
solar system; 14 modules; 13.5 kWh
Storage, 1 Tesla Powerwall-3 battery
with integrated PV inverter with 4
strings. 200A bus with 200A MCB,
interconnection via PCS, Tesla
Backup Switch for whole home
backup.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 05/21/2025 | BULD - Electrical Clearance | Passed | Approved solar and powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter |