Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Solar
Address:
4841 E 13TH ST
Address NEW:
4841 E 13TH ST
Apply Date:
02/24/2025
Applicant:
TFS Solar
Description:
Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.

Permit Reviews

Permit Number - TC-SOL-0225-00226
Permit Status: Inspections
Permit Description: Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Start Date Submittal Complete Date Status  
02/25/2025 RESIDENTIAL SOLAR APP v.1 02/25/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0225-00226
Permite Description: Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/15/2025 BULD - Electrical Clearance N/A Partial Pass Partial pass. Clearance for TEP DGL. (Tesla Backup Switch) 5/15/2025

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0225-00226
Permit Description: Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 4 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 2
Date Description Inspector Results Comments
05/21/2025 COT - RSOL - Electrical Final Solar Project Passed
05/21/2025 BULD - Electrical Clearance Passed Approved solar and powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20250224-9-240-30-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-DURAZO DENISE PV 6.09KW STORAGE 13.5KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW
SPECS-DURAZO APPROVAL-UPLOADS-SA20250224-9-240-30-A_V1.PDF DOCUMENTS VIEW