Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-SOL-0125-00081
Permit Details
Apply Date:
01/23/2025
Applicant:
Inty Ops
Description:
Install of a 11.50 kW (AC) PV system with battery integrated
Permit Reviews
Permit Number - TC-SOL-0125-00081
Permit Status: Complete
Permit Description: Install of a 11.50 kW (AC) PV system with battery integrated
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/12/2025 | RESIDENTIAL SOLAR APP v.4 | 03/12/2025 | APPROVED |
| 02/26/2025 | RESIDENTIAL SOLAR APP v.3 | 02/26/2025 | REQUIRES RESUBMIT |
| 01/27/2025 | RESIDENTIAL SOLAR APP v.2 | 01/27/2025 | REQUIRES RESUBMIT |
| 01/24/2025 | RESIDENTIAL SOLAR APP v.1 | 01/24/2025 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0125-00081
Permit Description: Install of a 11.50 kW (AC) PV system with battery integrated
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2025 | BULD - Electrical Clearance | Passed | Approved solar, collar and powerwall 3 - DGC/BAT/DGL Clearance to TEP is required for the solar meter | |
| 04/02/2025 | COT - RSOL - Electrical Final Solar Project | Passed |